::Technical Services - Engineering

Advantek provides incisive, cost effective design solutions that can meet the most challenging client requirements without breaking the construction budget. This is especially important for energy projects, which have performance and economic criteria that must both be met, for example, “35-percent savings within a 3-year payback period.” Advantek Consulting, a licensed Engineering firm, typically provides conceptual (10%) and partial (30%) designs and CSI-format specifications for projects utilizing advanced or complex equipment, systems and/or control sequences.


 
  • Energy efficient humidity-control & ventilation systems design
  • High performance HVAC system design and control sequences
  • Chiller plant renovation and optimization
  • Super efficient ENERGY STARTM and GREEN BUILDINGTM design
  • Laboratories, ISO-14644/ FS209 clean spaces, and biohazard containment
  • Energy efficient compressed-air system design
  • Solar, wind, biogas, and distributed energy systems design and application
  • Integrated digital building control system design
  • Commissioning of HVAC and building automation systems

Example Project

Post Construction Commissioning

After a series of investigations by other firms, the cause of excessive humidity at the Alachua County Corrections Center was finally determined by Dr. West using detailed data acquisition and computer modeling tools. The elusive nature of the root-causes was due to several factors, none of which alone was enough to explain the problem. Acting together, this combination resulted in humidity levels of 70 to 90% rh. Causes included pressure imbalances within the building, mis-calibrated damper actuators, and control system programming oversights. An adjust, balance, and commissioning specification was developed and engineering oversight ensured that every detail of the specification was properly implemented. Due to this attention to detail, an airflow problem was traced to a measurement error by the TAB contractor. Humidity levels are now maintained below 60% rh and the County is enjoying energy savings of about $80,000 per year.

 